West Palm Beach Painting · Palm Beach County

Painting Services in West Palm Beach, FL

Henry Craftsmen handles interior repaints, exterior stucco resurfacing, trim painting, cabinet refinishing, and drywall repair across West Palm Beach and Palm Beach County. Intense UV, long wet seasons, salt-laden air near the coast, and daily summer humidity all accelerate fading, mildew, and caulk failure. Every project is scheduled around South Florida conditions, association approval timelines, and the slab-on-grade construction common across the 33401  ·  33412 zip codes.

HOA color submissions for El Cid, Flamingo Park, Ibis / western communities handled before scheduling begins.
Elastomeric and acrylic exterior coatings rated for West Palm Beach salt air, UV exposure, and mildew resistance.
Prep-first approach — urban core, historic districts, and mixed-use corridors can create tighter scheduling windows, parking limits, and more visible inspection enforcement before any coating is applied.
Weather-aware scheduling built around Palm Beach County's June–October rainy season.

Get Instant Paint Quote

We respond within 1 business day.

West Palm Beach, FL  ·  33401  ·  33412

Interior & Exterior Painting Projects in West Palm Beach

Interior Painting

Interior Painting: Walls & Ceilings: Full Home

West Palm Beach, FL · Downtown WPB · 33401

Project Cost
$2,700
Zip Code
33401
Date
Jan 2026
Rooms
Living Areas, Hallway
Highlight
Featured Color: Benjamin Moore White Dove
Scope
144 SF
Duration
3-5 days
Products Used
  • Benjamin Moore White Dove
  • Benjamin Moore Chantilly Lace
  • Wooster - Shortcut Angle Sash Brush 2 In.
  • DAP Drydex Spackling
  • Zinsser - Bulls Eye 1-2-3 Primer - 1 Gal
Exterior Stucco Repaint

Exterior Painting: Full Home / Stucco

West Palm Beach, FL · Southend · 33405

Project Cost
$3,050
Zip Code
33405
Date
Feb 2026
Rooms
Full Exterior, Stucco, Trim
Highlight
Featured Color: Zinsser - Bulls Eye 1-2-3 Primer - 1 Gal
Scope
222 SF
Duration
4-6 days
Products Used
  • Zinsser - Bulls Eye 1-2-3 Primer - 1 Gal
  • Zinsser - Perma-White Mold & Mildew Proof Interior Paint 1 Gal
  • Usg - Sheetrock Setting-Type Joint Compound 20 Lb
  • 3M - Scotchblue Painter Tape 2In X 60Yd
  • Purdy - 9 In. Roller Cover
  • Sherwin-Williams Repose Gray
Interior Repaint

Interior Repaint: Walls + Trim + Doors

West Palm Beach, FL · Northwood · 33407

Project Cost
$1,650
Zip Code
33407
Date
Mar 2026
Rooms
Bedrooms, Closet Doors
Highlight
Material: Sherwin-Williams Repose Gray
Scope
102 SF
Duration
2-3 days
Products Used
  • Sherwin-Williams Repose Gray
  • Sherwin-Williams Pure White
  • Purdy - Nylox Dale 3/8 In. Nap 9 In. Paint Roller Cover
  • DAP Alex Plus Acrylic Latex Caulk Plus Silicone
  • Sherwin-Williams Duration Home Exterior Satin
Quick Answer

Interior and Exterior House Painters in West Palm Beach

West Palm Beach painting projects range from single-room touch-ups to full exterior stucco repaints on the CBS and concrete-block construction common throughout Palm Beach County. Interior scopes include wall prep, drywall repair, caulking at trim and window surrounds, priming, and two finish coats. Exterior scopes add stucco assessment, elastomeric coating selection, fascia and trim painting, and color-board coordination for deed-restricted communities.

Most West Palm Beach homeowners schedule painting before listing, after a renovation, or when exterior surfaces show chalking, peeling, or mildew from South Florida's coastal humidity. Project timelines run two to ten days depending on scope and association approval lead time. All estimates are scoped on-site before a price is given.

What drives cost

  • · Coastal exposure (Moderate to high) — proximity to salt air determines primer grade and whether elastomeric or standard acrylic coatings are specified for West Palm Beach exteriors
  • · Stucco condition — cracks, chalking, and efflorescence require remediation before coating; skipping it causes premature failure on West Palm Beach surfaces
  • · Association pre-approval — color-board submissions and COI letters add scheduling lead time in gated and association-governed communities throughout Palm Beach County
  • · Finish selection — Duration and Aura lines add material cost vs. standard; mold-resistant formulas required in kitchens, baths, and laundry
  • · Permit requirements — City of West Palm Beach Development Services review confirmed at walkthrough; urban core, historic districts, and mixed-use corridors can create tighter scheduling windows, parking limits, and more visible inspection enforcement.
  • · Wet-season timing — June–October afternoon storms limit exterior coating windows; weather-aware scheduling built into every outdoor West Palm Beach scope
Service Area

West Palm Beach & Palm Beach County

Henry Craftsmen serves West Palm Beach and surrounding Palm Beach County communities. ZIP codes, association density, construction type, and local conditions vary significantly across the area—each affects painting product selection, scheduling, and prep scope.

El Cid

Historic Mediterranean Revival neighborhood; exterior color changes may require historic preservation review. Original stucco on older CBS construction. Pre-listing and renovation repaints are the most common scope.

Flamingo Park

Historic district with deed restrictions; exterior paint colors may be reviewed by the city's historic preservation process. Older CBS construction common throughout. Exterior scopes require pre-approval before work begins.

Ibis / western communities

Master-planned golf communities with active HOA boards. Color-board submission and COI required before exterior work is scheduled. Staging and access managed per community rules.

ZIP 33401 Corridor

Slab-on-grade construction typical of this West Palm Beach area. Intense UV, long wet seasons, salt-laden air near the coast, and daily summer humidity all accelerate fading, mildew, and caulk failure. Subfloor and access conditions assessed before scheduling.

ZIP 33412 Corridor

Slab-on-grade construction typical of this West Palm Beach area. Intense UV, long wet seasons, salt-laden air near the coast, and daily summer humidity all accelerate fading, mildew, and caulk failure. Subfloor and access conditions assessed before scheduling.

El Cid & Flamingo Park — 33401

Historic districts with deed restrictions. Exterior color changes may require historic preservation review. Original CBS and stucco construction from the 1920s–1950s. High demand for pre-listing and renovation repaints.

Southend & Downtown WPB — 33405

Urban core with mixed residential and commercial. Parking limitations, building-access constraints, and active inspection enforcement can affect scheduling. Condo work requires building-management coordination.

Ibis & Western Communities — 33412

Master-planned golf communities with active HOA boards. Color-board submission and COI required for all exterior scopes. Interior repaints at move-in common in this high-owner-occupancy corridor.

Permit Coordination

Permit review through City of West Palm Beach Development Services. Urban core, historic districts, and mixed-use corridors can create tighter scheduling windows, parking limits, and more visible inspection enforcement.

Zip codes served: 33401, 33412. Permit coordination through City of West Palm Beach Development Services. Urban core, historic districts, and mixed-use corridors can create tighter scheduling windows, parking limits, and more visible inspection enforcement..

Common Project Types

What West Palm Beach homeowners most often schedule

The most frequently requested painting scopes Henry Craftsmen handles across West Palm Beach and Palm Beach County—with what each involves on the ground.

Full Interior Repaint

Walls, ceilings, trim, and doors across all rooms. Includes surface wash, drywall crack fill, full caulk bead at all trim and window surrounds, primer where needed, and two finish coats. Mold-resistant formula in kitchens, baths, and laundry in all West Palm Beach scopes.

Exterior Stucco Repaint

Full home exterior including stucco field, fascia, soffit, trim, and shutters. Starts with pressure wash and stucco inspection, elastomeric crack filler, caulk at all penetrations, primer rated for coastal exposure, and two UV-resistant topcoats. Color-board coordination handled.

Pre-Listing Touch-Up

Targeted interior wall repairs and touch-up painting scoped at walkthrough to focus on visible impact areas. Drywall patch, texture match, and spot prime included before finish coat. Typically 1–2 days for a standard West Palm Beach home.

Interior + Cabinet Combo

Interior repaint sequenced with cabinet refinishing—paint scope completes first, cabinet doors follow. Door and drawer face removal, deglossing, sanding, primer, and two topcoats. Avoids two separate mobilizations for West Palm Beach homeowners.

Drywall Repair + Paint

Water damage, settling cracks, or renovation cut-ins repaired with setting compound, skim coat, and texture match before painting. Zinsser Bulls Eye 1-2-3 primer on all repaired surfaces. Finish is consistent across the full wall—not patched over.

New Construction Paint

Interior and exterior painting for new builds and gut renovations in West Palm Beach. Primer on all drywall, two-coat finish on walls, single-coat on ceilings. Exterior uses Loxon XP stucco prime before topcoat. Sequenced around trade completion schedule.

Sherwin-Williams

Duration Home (interior scrubbable), Duration Exterior (UV and mildew rated), Emerald (premium interior), and Loxon XP (stucco prime). Frequently specified for West Palm Beach exterior work due to elastomeric performance in South Florida coastal conditions.

Benjamin Moore

Aura Exterior (premium salt-air rated), Aura Interior (zero VOC), Regal Select (standard interior). Specified for premium scopes and color-sensitive projects across Palm Beach County where finish quality is a priority.

Zinsser & DAP

Bulls Eye 1-2-3 primer for adhesion on patched surfaces and new drywall. Perma-White for mold-resistant applications in baths and laundry rooms. DryDex spackling for surface repair before painting on West Palm Beach interiors.

Who Typically Hires Henry Craftsmen

The West Palm Beach homeowners behind most projects

Pre-Sale Sellers

Homeowners preparing to list who need interior touch-up or a full repaint — and exterior stucco work — completed before photos and showings. Typical timeline: 2–5 days depending on scope in West Palm Beach.

Move-In Buyers

New owners who want a full interior repaint before furniture arrives. Often combined with cabinet refinishing or drywall repair from the inspection list. Full interior and cabinets typically 4–7 days in a standard West Palm Beach home.

HOA Compliance

Homeowners in gated communities who received an exterior repaint notice from their association. Henry Craftsmen prepares the color-board packet and COI letter and submits before scheduling. Projects don't start until written approval is confirmed.

Renovation Finishers

Homeowners who completed a kitchen or bath renovation and need the rest of the home repainted to match. Interior painting and cabinet touch-ups handled together. Sequenced around trade completion in West Palm Beach remodels.

How every project runs

1

On-site walkthrough & scope document

Surface conditions, room count, prep requirements, and product selections documented before a price is given. Substrate condition on West Palm Beach stucco is assessed at this stage.

2

Association submission & permit confirmation

Color-board packets and COI letters submitted for deed-restricted communities in West Palm Beach. Permit requirements confirmed with City of West Palm Beach Development Services before scheduling.

3

Prep & repair before coating

Drywall repair, caulking, surface cleaning, and priming completed before any finish coat goes on. Prep is not optional on West Palm Beach surfaces — moisture exposure makes proper adhesion treatment a requirement.

4

Finish coats & quality walk

Two finish coats applied, then a documented walk with the homeowner. Touch-ups addressed before the crew leaves the property.

What’s included in every scope

  • · Surface prep and drywall repair
  • · Caulking at trim, windows, and penetrations
  • · Primer coat (full or spot, based on condition)
  • · Two finish coats on all painted surfaces
  • · Masking and floor/furniture protection
  • · Daily cleanup and final touch-up pass

Typical project timelines

  • · Interior single-room: 1 day
  • · Interior full home (1,500–2,500 SF): 2–4 days
  • · Exterior full home: 3-5 days
  • · Interior + exterior combined: 5–9 days
  • · Interior + cabinets: 4–7 days
Reviews

What West Palm Beach homeowners say

★★★★★

“We are in Flamingo Park and exterior color changes here require documentation. Henry Craftsmen knew the process upfront, submitted the right paperwork before scheduling, and the project finished on time without any permit issues.”

L. Harrington · Flamingo Park, West Palm Beach

★★★★★

“Full interior repaint at move-in across the whole house. They were done in three days — ahead of when we expected — and the furniture was in before the week was out. Prep was done right on every wall.”

D. Fairbanks · El Cid, West Palm Beach

★★★★★

“Our Ibis home needed exterior repaint and association approval before work could start. Henry Craftsmen coordinated with building management, filed the color-board packet, and had the job scheduled and approved in under two weeks.”

P. Nguyen · Ibis, West Palm Beach

Frequently Asked Questions

Questions West Palm Beach homeowners ask before scheduling

Interior painting in West Palm Beach typically runs $1.50–$3.50 per square foot for walls and ceilings, depending on surface condition, finish level, and room count. Exterior full-home repaints on standard CBS or stucco construction run $3,000–$7,000+ depending on square footage, stucco repair scope, and association color-board requirements. Coastal proximity in Palm Beach County adds prep cost due to salt-air degradation and the need for premium elastomeric coatings. Every West Palm Beach estimate is scoped on-site before a price is given.
Most association-governed communities in West Palm Beach—including El Cid and Flamingo Park—require written color-board approval and a contractor COI before exterior work can begin. Color boards, contractor insurance certificates, and restricted work hours are common requirements across Palm Beach County. Henry Craftsmen prepares the color-board packet, COI letter, and any required documentation and submits before a start date is scheduled. Projects don’t go on the calendar until written approval is confirmed.
Most West Palm Beach exteriors need repainting every 5–8 years, compared to 8–12 years in drier climates. Intense UV, long wet seasons, salt-laden air near the coast, and daily summer humidity all accelerate fading, mildew, and caulk failure; exterior schedules have to work around afternoon rain windows and substrate dry time. Homes closer to the coast in Palm Beach County—particularly in areas like El Cid—degrade faster and may need recoating closer to the 5-year mark. Interior repaints are typically driven by lifestyle changes, resale prep, or finish wear rather than a fixed interval.
Standard residential repaints in the same color family typically don’t require a permit through City of West Palm Beach Development Services. However, urban core, historic districts, and mixed-use corridors can create tighter scheduling windows, parking limits, and more visible inspection enforcement. Henry Craftsmen confirms permit requirements during the walkthrough before scheduling begins—not on the day of the project.
West Palm Beach stucco homes need elastomeric or 100% acrylic coatings rated for UV resistance, mildew resistance, and moisture-vapor management. A shallow water table increases moisture movement through exterior assemblies, shortening coating life on windward surfaces. Sherwin-Williams Duration Exterior and Benjamin Moore Aura Exterior are most frequently specified for West Palm Beach and Palm Beach County coastal work. Product selection is confirmed at the walkthrough based on substrate condition.
A full exterior repaint of a typical West Palm Beach CBS or stucco home (1,500–2,500 SF) takes 3–6 working days: one day for pressure wash and prep, one to two days for stucco repair and caulking, and two days for primer and two topcoats. Weather windows between Palm Beach County’s June–October rainy season are built into the schedule. Association approval timelines are confirmed before a start date is set.
Gated and association-governed communities throughout West Palm Beach tend to have the most documentation requirements before exterior work can start. In El Cid and Flamingo Park, color-board packets, COI letters, and contractor pre-qualification are often required before any exterior scope is scheduled. Henry Craftsmen handles all association documentation before a start date is set.
A standard interior painting scope for West Palm Beach homes includes: surface cleaning, drywall crack fill and texture match, full caulk bead at all trim, window, and door surrounds, primer coat on all repaired or previously unpainted drywall, two finish coats on walls and ceilings, trim and door painting, and a documented final quality walk. Mold-resistant formulas are applied in kitchens, bathrooms, and laundry areas. Prep is not optional on West Palm Beach surfaces—moisture exposure makes proper adhesion treatment a requirement, not a preference.
Get Started

Ready to schedule a West Palm Beach walkthrough?

Tell us about your project and we’ll reach out within one business day to schedule a free on-site estimate. Serving West Palm Beach and surrounding Palm Beach County communities—Interior Painting: Walls & Ceilings: Full Home, Exterior Painting: Full Home / Stucco, Interior Repaint: Walls + Trim + Doors.

West Palm Beach · El Cid · Flamingo Park · Ibis / western communities