Exterior Painting in Houston, TX
Exterior repaints on brick veneer and HardiePlank fiber cement across Houston and the surrounding metro. Sustained humidity, a long storm season and clay that moves the slab underneath all decide how an exterior finish is specified and when it can go on.
Lock in 10% off today. Call now and place a deposit to secure your spot.
713-955-8686We respond within 1 business day.
Houston, TX: 77007, 77024, 77084, 77379, 77429, 77494
Exterior Painting Projects in Houston
Exterior Repaint (Brick and Fiber Cement)
Meyerland, Houston, TX
- Sherwin-Williams Resilience Exterior Acrylic
- Satin
- Sherwin-Williams Loxon Masonry Primer
- Sherwin-Williams Extreme Bond Primer
- DAP Alex Plus Acrylic Latex Caulk
Exterior Repaint (Brick and Fiber Cement)
Grand Lakes, Katy, TX
- Sherwin-Williams Resilience Exterior Acrylic
- Satin
- Sherwin-Williams Loxon Masonry Primer
- Sherwin-Williams Extreme Bond Primer
- DAP Alex Plus Acrylic Latex Caulk
New Construction Paint-Out
Quail Valley, Missouri City, TX
- Sherwin-Williams ProMar 400 Interior Latex
- Sherwin-Williams ProBlock Primer Sealer
- DAP Dynaflex 230 Sealant
Exterior Repaints Built for Houston Weather and Houston Soil
Two things shorten an exterior finish here. Clay movement separates trim joints and opens the gaps a coating is supposed to bridge, and sustained humidity changes how the film cures in the first place. On the shaded north side of the metro, mature pine canopy keeps siding and trim damp well past sunrise, so rot at fascia and trim joints is the more common finding than chalking.
Houston Exterior Prep Checklist
Shaded elevations hold moisture long after the rest of the house has dried. On homes under heavy canopy in The Woodlands, Tomball and the older Houston neighborhoods, north and east faces are scheduled later in the day for that reason.
Local Compliance & Performance
- Association and Deed Restrictions: Houston has no zoning, so land use runs on recorded deed restrictions that vary street to street, and master-planned communities add their own architectural review. Color-board packets and association documentation are prepared and submitted before a start date goes on the calendar.
- Specified for Gulf Humidity: Summer humidity near 75 percent with dew points in the low 70s changes how a film cures, not just how long it takes. Coatings are specified for that load and for the substrate on the house: brick veneer and HardiePlank fiber cement far more often than stucco.
- Scheduling Around the Rain: About 50 inches of rain a year, with June and October the wettest months, narrows the dependable exterior window to spring and fall. Elevations are staged so no face is left half-coated when the weather turns.
- Permit Coordination: The City of Houston lists painting, flooring and cabinets as permit-exempt interior finish work. Most homes mailing as Katy, Cypress, Spring, Humble or Richmond sit outside those city limits, where Harris or Fort Bend County is the authority. Harris County issues no building permit for interior repainting. We confirm which office covers your address at the walkthrough.
What is included in an exterior repaint?
How much does exterior painting cost in Houston?
A full exterior repaint on a typical Houston home runs roughly $6,000–$12,500, driven by size, substrate and how much trim repair the walkthrough turns up. Fiber cement and brick are priced differently. Every estimate is scoped on site.
How often should I repaint an exterior in Houston?
Sooner than in a drier climate. Sustained humidity, a long UV season and seasonal joint movement all shorten the cycle. The tells are chalking on the sun-facing elevations and caulk that has pulled away at the trim joints, and under pine canopy the shaded faces usually go first. We look at those rather than at the calendar.
Do I need approval to repaint my exterior?
In The Woodlands, yes. The Township's Residential Design Review Committee must give written approval before work starts, and that is the one market in this metro where the answer is an unqualified yes. Elsewhere it depends on your recorded deed restrictions and whether a master-planned community runs architectural review. We check your street rather than assume.
What about wood rot and trim replacement?
It is found at the walkthrough and priced before work starts, not discovered mid-job. Fascia, soffit and trim under heavy canopy are the usual places. Coating over soft wood buys a season at most.
When can exterior work be scheduled?
Spring and fall are the widest dependable windows. June and October are the wettest months and summer afternoons bring storm risk, so wet-season work runs morning-first with dry-time buffers and one elevation at a time.
Where We Work
Henry Craftsmen works across Houston and the surrounding metro, in Harris, Fort Bend, Montgomery and Brazoria Counties. Choose your city for local project detail, neighborhood notes and the permitting authority that covers that address.